Info sheet
Broadband when moving house: when to order and what to ask
Checked 9 November 2026Ofcom rates 20/07/2026Survey of 500 movers, 2023Rents from October 2026 listingsHow we worked it out
Order broadband as soon as you have a signed tenancy and a start date, and plan for about a week without it either way: in a 2023 survey, two weeks' notice made no clear difference. Ofcom and Openreach give no lead time in days.
Written for: A tenant moving into a London flat, including a new-build, who needs broadband working from the first day and wants to know when to order.

7.2 daysoffline on average after a move, in a 2023 survey of 500 UK movers
In short
Expect about a week without broadband after you move; in the one survey we found, ordering early made no clear difference.
So order once the tenancy is signed, test the line on moving day, and ring the provider the same day if it is not live.
Moving day costs cash too: £5,583 on Peckham's typical 2-bed, £5,164 in West Greenwich and £4,690 in Hither Green, counting the first month's rent, a five-week deposit and a month of bills at council tax Band D (where the bills come from). We found no dated typical monthly price for broadband, so compare quotes for your postcode.
If you already have broadband, ask your current provider to move the service to the new address once you have the start date. If you do not, order from a new provider that day, after checking the flat's address on Ofcom's broadband checker. Still choosing the flat? Set your desk, budget and journey limit on the map, here Bank, £2,500 and 35 minutes, and check each shortlisted postcode.
Is it worth ordering two weeks ahead? In an August 2023 survey, movers who gave two weeks' notice or more were offline for 7.1 days against 7.2 for all movers, so it made no clear difference. If your move is sooner than two weeks away, order anyway, ask for the earliest install slot and plan to tether from a phone for the first days. The same survey found that movers who told their provider only after moving in were offline for 10.3 days, a group of about 45 people, so the size is approximate, and a survey cannot show that the late call caused the wait.
1What to do, and when
Do these in order, starting with a written answer from the landlord before you sign.
- Before you sign: Ask the landlord or agent whether the flat has a working line or cable, and get the answer in writing. A message you can paste: "Does the flat have a working broadband line, which network is it on, and may an engineer visit if a socket is needed?"
- The day you sign: Order, or ring your current provider to move the service, and ask for the install date in writing.
- Moving day: Plug in and test; if it is not live, tell the provider the same day and note the date.
- The first week: Run a speed test and keep the result.
- If the date is missed: Ask for the compensation below, which runs from the date you were promised.
Do not order before the agreement is signed; the holding deposit guide explains how a home can still fall through at the checks stage. Openreach says timing depends on the service you have now, what is already at the new property and whether an engineer must do extra work, and that your provider confirms exact timings. It advises contacting your provider as early as possible. Ofcom says to arrange the new service "in time for when you move" and, like Openreach, gives no number of days.



2How long you can expect to be offline
A typical mover is offline for about a week: 7.2 days on average in a 2023 survey of 500 UK adults who had moved in the previous two years.
Opinium ran the survey for Uswitch. It covers owners and renters together, not tenants alone. London movers reported 5.1 days, among the fastest regions in the report, which gives no regional sample size, so treat London's figure as an indication. Movers gave their provider 13.5 days' notice on average, and 18% gave one week. The report says the average is slightly under providers' minimum, and that minimum varies by provider, so ask yours.
The 10.3 days comes from about 45 people, so treat it as an approximate size.
Two weeks' notice made no clear difference; telling the provider after the move was linked to about 3 more days offline
- 7.1 daysgave their provider two weeks' notice or more
- 7.2 daysall movers
- 10.3 daystold their provider after moving in
A tenant who orders on the day of signing often cannot give two weeks' notice, and the survey gives no reason to hold out for it. Order as early as the agreement allows and book an install date, so the week is planned rather than a surprise.
Rent starts on the first day of the tenancy whether or not the broadband is on, so the wait is not an extra charge. It is a week of working and streaming without a connection. If you work from home, arrange a backup before day one, such as tethering from a phone. The bigger cost of moving day is the cash: on Peckham's typical 2-bed at £2,425 a month, the calculator below counts first month's rent, a five-week deposit and a month of bills, which comes to £5,583.
How much do you need to move in?
£5,583to have ready by moving day, first month's bills included
A worked example for £2,425 a month in Southwark, Band D, with no removals or furniture. Turn on JavaScript to type your own.
A landlord can ask for one month's rent in advance and a deposit of up to 5 weeks' rent (6 when the rent is £50,000 a year or more). Bills are one month of energy (Ofgem's October to December 2026 cap), water (Thames Water, studio or 1 bed) and council tax (2026 to 2027, in 12 payments). Removals and furniture are your own figures; we add none.
3Checking the address
Type the flat's full postcode into the Ofcom checker, and ask the agent for the exact flat number and postcode so you check the right one.
It shows the fastest speed predicted for standard (less than 30 Mbps), superfast (30 to 300 Mbps) and ultrafast (more than 300 Mbps), each with a symbol: a green tick means packages are generally available, an amber triangle that they reach some properties, and a red cross that they are not available. What you receive may differ, so ask the provider to confirm the address. If you plan to keep your current provider, Ofcom also advises checking that your current network is available where you are moving to.
4New-build flats and what to ask the landlord
A new-build may have no line yet, so ask the landlord or managing agent whether the building is already connected before you order.
Openreach says that if the property has no line, your provider requests one from Openreach, and an engineer visits only if needed. Ask whether an engineer may visit or fit a socket.
The share of homes built since 2010 shows where this question comes up most. In Citycomb's area files, from the VOA stock count of March 2026, it is 38% in Nine Elms, 35% in Surrey Quays & Greenland Dock and 26% in West Greenwich, against 5% in Hither Green. That is an area share, not a fact about the building you shortlist, so ask at every viewing.
GOV.UK's Tenant Fees Act guidance says services like broadband and a landline phone can be included in your rent payment, and that a landlord can require you to pay some utilities and other bills separately. The tenancy agreement shows which applies, so check it before you order. The flat viewing checklist covers what to test at the viewing, including signal and broadband speed.
5If the install runs late
If your provider is in Ofcom's automatic compensation scheme and misses the start date it promised, you are owed £6.46 for every calendar day of delay.
A missed engineer appointment, or one cancelled with under 24 hours' notice, pays £32.31.
Seven days at £6.46 a day, plus one missed visit at £32.31.
A week's late install and one missed engineer visit pays £77.53
| Late start, 7 days£6.46 for each calendar day | £45.22 |
|---|---|
| Missed engineer appointmentor cancelled with under 24 hours' notice | £32.31 |
| Compensation in this example | £77.53 |
The scheme covers BT, EE, Hyperoptic, Plusnet, Sky, TalkTalk, Utility Warehouse, Virgin Media, Vodafone and Zen. TalkTalk has restrictions for customers not on the Openreach network.
The payments are not open-ended. Ofcom says the credit should arrive within 30 calendar days of the delay being resolved or the appointment date, and that after 30 days of payments a provider can serve a cease notification, so payments stop after another 30 days. The provider must then make reasonable efforts to offer a suitable alternative service, and if it cannot, you stay entitled to compensation.
6Taking your current contract with you
Ask your provider what happens when you move, because it depends on whether it serves the new address.
Citizens Advice says you might have to pay a fee to move the service, and a cancellation fee to leave early if your provider does not serve your new area, and that the provider might reduce or remove the fee if you explain. Check the months left on your term first. If you order a new contract online or by phone, you can cancel for free within 14 days, though you are likely to be charged for what you have used.
If you would rather switch to a new provider at the new address, Ofcom's One Touch Switch means you contact only the new provider. Ofcom's page, published in September 2024, says your current provider automatically gives you your switching information, lists early termination charges among it, and says you do not pay notice-period charges beyond the switch date. We found no dated Ofcom or Which? figure for a typical monthly price, so compare quotes for your postcode. Moving from overseas, the moving to London checklist sets the order date in a wider timeline.
7Where new-build matters on the map
The map shows which new-build areas fit your own desk and budget: with Bank, £2,500 and 35 minutes, 10 areas fit.
The map card draws three: Surrey Quays & Greenland Dock has 35% of homes built since 2010, West Greenwich 26% and Hither Green 5%. In the first two, ask whether the building is connected; in all three, check the postcode on Ofcom's checker before you sign. For a bigger new-build area, raise the limits to £4,600 and 40 minutes: Nine Elms is inside both.
Surrey Quays and West Greenwich have far more newer homes than Hither Green; the share says nothing about your building.
Three of the 10 areas with a 2-bed at £2,500 or less within 35 minutes of Bank

What else do people ask?
How far ahead should I order broadband when moving house?
As soon as you have a signed tenancy and a start date. Openreach advises contacting your provider as early as possible and gives no number of days. In the August 2023 Uswitch survey, UK movers who gave two weeks' notice or more were offline for 7.1 days, close to the 7.2 average, while those who told their provider after the move were offline for 10.3, a group of about 45 people. Movers gave 13.5 days' notice on average, and providers' own minimums vary, so ask yours.
How long does it take to get broadband in a new house?
About 7 days in the August 2023 Uswitch survey (7.2 on average; 5.1 for London movers, whose sample size the report does not give), and about 10 days for the few who told their provider only after the move. Neither Ofcom nor Openreach gives a standard time: Openreach says it depends on the service you have now, what is already at the new property and whether an engineer must do extra work.
Can a tenant order broadband for a new-build flat?
Yes. A new-build may have no line yet. Openreach says that if a property has no line your provider requests one, and an engineer visits only if needed. Ask the landlord or managing agent whether the building is already connected, and whether an engineer may visit, before you order.
How do I check broadband speed at an address?
Put the postcode into the Ofcom broadband coverage checker. It shows the fastest speeds predicted for standard, superfast and ultrafast broadband in the area, though speeds received at a property may differ.
Can I take my existing broadband contract with me?
Ask your provider; it depends on whether it serves the new address. Citizens Advice says you might have to pay a fee to move the service, and a cancellation fee if your provider does not provide the same service in your new area. It is worth asking the provider to reduce or remove the fee.
What compensation do I get if the installation is late?
Ofcom's automatic compensation scheme pays £6.46 for each calendar day a new service starts later than the date promised, and £32.31 for a missed engineer appointment, credited within 30 calendar days of the resolution. BT, EE, Hyperoptic, Plusnet, Sky, TalkTalk, Utility Warehouse, Virgin Media, Vodafone and Zen are signed up.
Can I cancel broadband after ordering it?
If you signed up online or by phone less than 14 days ago, Citizens Advice says you can cancel for free, though you are likely to be charged for what you have used.
How did we work this out?
The figures, their dates and sources
Speeds and coverage categories come from Ofcom's broadband checker (read 09/11/2026), contract rules from Citizens Advice, compensation amounts and payment rules from Ofcom's automatic compensation page (updated 20/07/2026, read 09/11/2026), switching rules from Ofcom's page on One Touch Switch (published 12/09/2024, read 09/11/2026) and installation timing from Openreach's moving-house page. Neither Ofcom nor Openreach gives a standard installation time or a minimum notice period on the pages read; Openreach's advice is to contact your provider as early as possible, and Ofcom's moving-home page says to arrange the service "in time for when you move".
The delay figures come from one survey: Opinium for Uswitch, 500 UK adults who had moved house in the previous two years, owners and renters rather than tenants only, with fieldwork on 26 to 29 August 2023, read in ISPreview's report of 19 October 2023 (re-read 09/11/2026). Telecompaper reports the same 7.2-day average, but the rest of its article is behind a registration wall, and we found no Uswitch release. The days-offline figures are UK-wide except London's 5.1 days, which the report lists among the fastest regions without giving a regional sample size. The 10.3 days for movers who told their provider after the move comes from about 45 people (9% of 500), so it is an approximate size, and a survey cannot show that the late call caused the wait. The 13.5 days' notice and the 18% who gave one week are from the same report; providers' minimums are as the report gave them in 2023.
The shares of homes built since 2010 are from Citycomb's area files, built from the VOA Council Tax stock of properties (31/03/2026, Open Government Licence). They describe an area, not the building you shortlist. Rents on the map card are Citycomb's typical asking rent for a 2-bed in each area (our Mid finish, public listings read in October 2026); each of the three has more than 10 listings behind it. The Tenant Fees Act wording is from GOV.UK's guidance for tenants. We found no dated Ofcom or Which? figure for a typical monthly broadband price, so this page gives none.
Where do these figures come from?
- Citycomb: Bills for a London flat, 9 November 2026
- Ofcom: Broadband coverage checker, 9 November 2026
- Ofcom: Moving home, top tips for keeping connected, 9 November 2026
- Citycomb: homes built since 2010 by area, from the VOA Council Tax stock of properties (31/03/2026), 9 November 2026
- Ofcom: Simpler broadband switching is here (One Touch Switch, published 12/09/2024), 9 November 2026
- Ofcom: Automatic compensation, what you need to know, 9 November 2026
- Openreach: Moving house and your broadband service, 9 November 2026
- Citizens Advice: Cancelling a phone, TV, internet or mobile contract, 9 November 2026
- ISPreview: UK home movers go without broadband for average of 7.2 days (Opinium survey for Uswitch, August 2023; article of 19 October 2023), 9 November 2026
- Telecompaper: Many UK home movers left without broadband for over a week, Uswitch (23 October 2023; the 7.2-day average only, the rest is behind a registration wall), 9 November 2026
- GOV.UK: Tenant Fees Act 2019, guidance for tenants, 8 November 2026